Unit 2, 3 & 4 Thomas Road Industrial Estate
VALUE:
£500,000.00
TIMESCALE:
16-weeks
Client
Vorboss Ltd
Value
£500,000.00
16-weeks
Type of Contract
Minor Works Building Contract
with Contractors Design
Scope of Works
This project involved the renovation of three existing industrial units to create modern office spaces and storage facilities. The aim was to transform the units into a functional, efficient, and aesthetically pleasing environments that meets the company’s operational needs. This included renewal of mechanical and electrical installations, Fire Upgrade works and specialist surface treatments.
Challenges
- APC were directed to design and build all elements of the works, keeping to a specific budget.
- The initial contract was to adapt the existing lighting and power cabling. On arrival for survey, APC found the previous tenant had stripped out numerous areas of cabling.
Solutions
- APC appointed a Building Control Officer, then advised and outlined regulatory items APC needed to Keep to. APC also appointed M and E Services, design and Lighting engineers to put forward schemes to suit the warehouse.
- With budget in mind, APC had to look for alternative existing proposals, bringing the contract down In some areas, to allow for the increase in cost for the additional cabling.
Why This Case Study
- APC were then able to complete any aspect of works with a design team, APC Contracts Managers were then able to take these design and keep them keep in line with the project finances.
- APC are able to adapt the existing proposals to overcome challenges and changes, whilst still falling in the contract finances.
You may also like
VALUE: £450,000 TIMESCALE: 6-weeks “The project at Bromley Primary School involved
VALUE: £925,000 TIMESCALE: 40-weeks “The project involved the careful restoration and
VALUE: £36,082.75 TIMESCALE: 4-weeks “A delightful renovation project at Dulverton Primary